Grid Connections

Our design team will deliver your project on time and on budget

All we need is a site plan to get started

All we require is a site plan and an accommodation schedule. In return, we will provide you with a no-obligation, fixed-price proposal for your connection works. As a registered Independent Connection Provider, we will use the information you provide to make all relevant applications to acquire a fixed point of connection from the DNO and then use it to prepare an outline design.

The Technicals

  • Cable Laying (LV, 11kV, 33kV)

  • Cable Jointing (LV, 11kV, 33kV)

  • LV Cable Networks

  • HV Cable Networks

  • Substation Installations

  • Full electrical design facility

Grid Connections

After preparing the outline design, we will develop a connection proposal and plan that is comprehensive and yet easy to follow.

The connection proposal and plan will list in detail the scope of work to be performed. It will also include a breakdown of all contestable and non-contestable work (see FAQs for more information on both categories.)

Case Study

Samuel Ryder Academy Works

We plan structure and organise

We understand that the most important factor in a connection for you, the customer, is that the project is delivered on time and on budget.

For that reason, and to ensure that all work is performed to specification, we will assemble a team of specialists in electrical engineering design and related professions, and then assign a project manager to direct their work and serve as the single point of contact for you.

Find out about our approach