Sinewave was appointed by Zenobe, one of the UK’s leading fleet electrification specialists, to deliver a two-phase installation and energisation at London’s Battersea Bus Depot.

Headlines

Over the course of this 2 year project, Sinewave’s scope of work included:

  • Cable route planning and design

  • Ducting layouts

  • Earthing designs

  • 1x DNO Ring Main Unit

  • 1x DNO Transformer Feeder Unit

  • 1x IDNO Package Substation

  • Over 2km of high-voltage cable installed in 250m phases

  • Providing power to the depot’s low-voltage switchroom

  • Commissioning and testing of new infrastructure