Supermarket Asset Replacement
Sinewave are contracted by one of the UKs largest chains of supermarkets, covering hundreds of locations nationwide, to carry out an Operations and Maintenance programme for the store’s HV & LV assets.
Headlines
Our client requested that we replace the LV switchboard and transformer based on the evidence provided by an inspection report, submitted by Sinewave’s engineers. Our scope of work included:
Overhanging tree branch removal
On site excavation to reveal cables
Safe removal of 100L of oil from old transformer
Hiab to lift and remove the old transformer and lower the new one.
Commissioning of new transformer
New cables laid and Earthing installed
1x HV Term & 11x LV Terms complete